Commercial Solar Installation

Fullerton, CA

This proposed rooftop photovoltaic system is intended to provide 94 kW of solar electric power to this Iron Mountain location in Orange County, CA. Here we have a total of (281) Adani Solar Multi-Crystalline 335W modules, which have been tested to produce more power per panel than the industry average, and also help reduce installation, transport, and land costs by about 2%. Also installed at this property is a SolarEdge Technologies, Three Phase Inverter system - (2) 33.3 kW and (1) 20 kW, which are specifically designed to work with power optimizers and have superior efficiency (98.5%).

Project Numbers

123K

I’m text. To update me, go to the Data Manager.

12K

I’m text. To update me, go to the Data Manager.

1,234

I’m text. To update me, go to the Data Manager.

Project Gallery

1/1
JDC Lime n White -Strike White.png

JDC ENERGY

CSLB 1025569

10373 Trademark St. Suite B

Rancho Cucamonga, CA 91730

 

Phone: 909-297-3626

Fax: 909-206-1583

AREAS COVERED

Claremont

Pomona

La Verne

San Dimas
Chino Hills

Covina

La Habra

Hacienda Heights

West Covina

Azusa

Baldwin Park

Diamond Bar

Walnut

Rowland Heights

Glendora

Eastvale

Corona

Riverside

Perris
Moreno Valley

Murrieta

Mira Loma

Menifee

Rialto

Colton

San Bernardino

Redlands

Yucaipa

Highland

Hesperia

Wildomar

Rancho Cucamonga

Fontana

Ontario

Upland

Chino

Montclair

Bloomington

  • White Yelp Icon
  • White Facebook Icon
  • White Google+ Icon
  • White Instagram Icon